We build the test system at the end of your production line
Before a board leaves the factory, a test station checks that it was assembled correctly. We build these stations, with the fixture that holds the board, the instruments, the test software and a record of every result. For Siegenia we developed one designed for 100,000 boards a year, at most 30 seconds per board.
Scope
What we take on
The work that takes a finished design into series production.
The test station
Fixture, instruments and software in one automated station that tests every board before it leaves the line.
A record of every board
One test record per board, stored under its serial number, so a fault found later can be traced back.
A test planned with the board
We place the test points while the layout can still change. That keeps the test short.
Documents for series production
What a manufacturer needs to build, program and test the product without asking the developers.
Coordination with your manufacturer
We settle the production data and the first batch with the board manufacturer and the assembler.
Questions
Questions about production tests
When should we plan the production test?
During the board layout. The test points have to be on the board before it is made, so we write the list of tests during development.
Do you build the boards in series?
No, a board manufacturer and assembler do. We prepare the production data, answer their questions, coordinate the first batch with them and build the test station. We can work with the manufacturer you already use.
Who owns the test system and its software?
You do. The station, its software and its documents are part of the delivery.
Do you work at a fixed price?
Yes, if the station can be specified in writing. Otherwise we work by the hour.

Oleksii Kvasnikov · Founder and lead engineer
Tell us the yearly volume and the time you have per board
Send the board or its layout too, if it exists.